Mongolia kicks off solar tender
3 June 2025
The government of Mongolia has kicked off a tender searching for an EPC contractor for the Myangad solar project.
The invite to tender says that bidding is open to contractors from eligible source countries of the Asian Development Bank (ADB). The bank has delivered financing for the works, which forms part of the country’s upscaling renewable energy project.
The project details on the ADB’s website state that the Myangad project will be a 19.8 MW facility developed in western Mongolia immediately to the east of the existing Khovd Nar 10 MW solar plant.
Construction is expected to be completed by the third quarter of 2026, after which the solar plant will be owned and operated by Western Energy System, the region’s transmission and distribution operator.
Interested bidders can purchase all relevant documentation for a non-refundable fee of $600 by contacting Mongolia’s Ministry of Energy. The deadline for applications is July 16, 2025.
Mongolia’s cumulative solar capacity stood at 143 MW by the end of 2024, up from 108 MW at the end of the year prior, according to figures from the International Renewable Energy Agency (IRENA).
Related
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Saudi Arabia qualifies developers for renewable projects
9 January 2026
-
Consultant appointed for Qatar-Bahrain causeway study
7 January 2026
-
Vestas gets 390MW wind turbine order in South Korea
5 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2