CEEC won the bid for the TUAS Water Recycling Plant project in Singapore
5 July 2024
Recently, China Energy Engineering Group Shanxi Electric Power Construction Co., Ltd.won the bid for the TUAS water recovery plant project in Singapore.
The project is located at 71a Tuas Nexus Drive in Singapore, and the scope of work includes procurement, construction, commissioning, etc. of the thermal control part of the C3D2 area. The TUAS water recycling plant project will have the water supply recycling plant and integrated waste management facilities located together, which can not only treat sewage and garbage simultaneously, but also save land usage and reduce carbon emissions.
This project is yet, another breakthrough for Shanxi Electric Power Construction to deeply penetrate the Singapore market.
Since entering the Singapore market in 2023, under the guidance of the group's " and " strategies, the company has implemented its overseas development layout, striving to gain recognition from the local market for high-quality engineering construction. The company's business and its contracts has been reported timely, achieving a virtuous cycle from the site to the market.
Related
-
Egis to manage thousands of kilometres of roads in Qatar
27 November 2025
-
Novi Sad plans to build waste-to-energy cogeneration plant
24 November 2025
-
Google plans €5.5bn infrastructure investment in Germany
22 November 2025
-
European Commission investigates Chinese subcontractor over Lisbon rail line
19 November 2025
-
One of Greece’s largest BESS projects moves ahead with Trina Storage
18 November 2025
-
Oman launches major BOOT tender for STP expansion
17 November 2025


京公网安备
11010802030424号
京ICP备19046776号-2