CEEC won the bid for the TUAS Water Recycling Plant project in Singapore
5 July 2024
Recently, China Energy Engineering Group Shanxi Electric Power Construction Co., Ltd.won the bid for the TUAS water recovery plant project in Singapore.
The project is located at 71a Tuas Nexus Drive in Singapore, and the scope of work includes procurement, construction, commissioning, etc. of the thermal control part of the C3D2 area. The TUAS water recycling plant project will have the water supply recycling plant and integrated waste management facilities located together, which can not only treat sewage and garbage simultaneously, but also save land usage and reduce carbon emissions.
This project is yet, another breakthrough for Shanxi Electric Power Construction to deeply penetrate the Singapore market.
Since entering the Singapore market in 2023, under the guidance of the group's " and " strategies, the company has implemented its overseas development layout, striving to gain recognition from the local market for high-quality engineering construction. The company's business and its contracts has been reported timely, achieving a virtuous cycle from the site to the market.
Related
-
Contractors submit Al-Maktoum airport superstructure bids
2 April 2026
-
Abu Dhabi receives four bids for Al-Nouf IPP
31 March 2026
-
Dubai seeks contractors for Nadd Hessa stormwater project
27 March 2026
-
CEECATL to supply 2GWh energy storage equipment in Oman
27 March 2026
-
Kuwait tenders major infrastructure packages
23 March 2026
-
Chinese construction group plans at least $3.5 bln investment in northern Vietnam province Bac Ninh
17 March 2026


京公网安备
11010802030424号
京ICP备19046776号-2