Acwa Power secures two solar-plus-storage projects in Morocco
7 August 2025
Saudi-listed Acwa Power has been awarded the Noor Midelt II and Noor Midelt III solar projects in Morocco, following an international tender run by the Moroccan Agency for Sustainable Energy (MASEN).
The two projects, located near the north Moroccan town of Midelt in the Atlas Mountains, each have a solar capacity of 400 MW and are both combined with 602 MWh of battery energy storage.
Acwa Power will be responsible for the design, funding, construction, operation and maintenance of the projects. Developed under a build-own-operate basis, each project is also backed by a 30-year power purchase agreement with MASEN expected to be the offtaker.
Marco Arcelli, Acwa Power CEO, said the company has now signed $3.5 billion worth of investments in Africa this year.
Noor Midelt II and III are part of the wider Noor Midelt project, the first stage of which is an 800 MW complex consisting of both solar and concentrated solar power. It was awarded to a consortium of EDF, Masdar and Green of Africa in 2019.
Morocco’s cumulative solar capacity stood at 934 MW at the end of last year, according to figures from the International Renewable Energy Agency (IRENA).
A report published by SolarPower Europe earlier this year said Morocco is on track to reach 3 GW of solar by 2028.
Related
-
New $2.1bln road development projects to ease congestion in Riyadh
1 January 2026
-
Romania’s Electrica opens two solar tenders
31 December 2025
-
Korean bank backs Guam’s largest solar project
28 December 2025
-
Masdar completes first project in £1 Billion UK BESS investment and announces project pipeline
26 December 2025
-
Masdar signs PPA for 200 MW floating solar project in Malaysia
25 December 2025
-
Vestas secures seven wind turbine orders for 273MW capacity in Germany
25 December 2025


京公网安备
11010802030424号
京ICP备19046776号-2