Skanska builds the orthopedic center of the future at the hospital in Hässleholm, Sweden, for about SEK 1.4 billion
11 April 2024Skanska has signed an agreement with Region Skåne to build a new care building and a new service building at the hospital in Hässleholm, Sweden. The contract is worth approximately SEK 1.4 billion, which will be included in the order bookings for Sweden in the second quarter of 2024.
The care and service buildings are planned as a continuous building body of approximately 24,000 square meters. The care building will contain reception, operating theatres, aftercare for orthopedics as well as a sterile technology unit and administrative premises.
The service building will cater for goods reception functions such as goods intake for meals, cold and freezer rooms, liquid storage, laundry handling, gas storage and a central waste facility. The building will also contain staff space and administrative premises.
The frame of the care building will consist of climate-improved concrete in both frame and cast-in-place constructions. The project aims to be environmentally certified in the Miljöbyggnad certification system.
The planning of the new parts of the Hässleholm hospital area has been going on for a long time and the project goes by the working name Forth, which stands for "Future orthopedics in Hässleholm".
Preparatory work will begin in the spring and construction is scheduled to begin in April 2024. The buildings are planned to be completed in the first half of 2028.

Related
-
Envision Energy, AMEA Power sign deal for 500MW Egypt wind project
22 June 2026
-
Montenegro’s CEDIS signs agreement with EDF, AFD on grid upgrade
12 June 2026
-
Consortium wins Ajman sewage treatment contract
11 June 2026
-
Saudi Arabia and Turkiye sign railway agreements
11 June 2026
-
Amea Power signs 1.5GWh battery storage EPC contracts
9 June 2026
-
Acwa signed COL with BCDA for 500-MW solar-plus-storage project in Philippines
5 June 2026


京公网安备
11010802030424号
京ICP备19046776号-2