Saudi’s Ceer awards $1.3 Billion Manufacturing Complex
9 March 2024
Ceer — Saudi Arabia’s first electric vehicle (EV) brand and original equipment manufacturer (OEM) has announced the awarding of a SAR 5 billion (USD 1.3 billion) contract for the construction of the Ceer Electric Vehicle Manufacturing Complex in King Abdullah Economic City.
The contract has been awarded to Saudi company Modern Building Leaders (MBL) to build a state-of-the-art facility, spanning over 1 million square meters, and will have an area under roof of 530,000 square meters. It will include dedicated zones for every stage of vehicle production, including a press shop, body shop, paint shop, and general assembly. Additionally, the complex will feature dedicated zones for logistics, waste management, warehouses, offices, water treatment system and a vehicle test track.
“We are delighted to witness the realization of our vision to ignite Saudi Arabia’s mobility industry, beginning with the construction of the Ceer Electric Vehicle Manufacturing Complex. This complex will be a benchmark for industrial excellence within the region and globally. It will feature the best technologies, equipment, and people, supported by partnerships with global industry leaders such as Dürr, Schuler, Siemens, ABB, and many more.” said Jim DeLuca, CEO of Ceer.
As Saudi Arabia’s first electric vehicle brand and OEM, Ceer — a joint venture between PIF and Foxconn — was launched to support the electric vehicle sector, aligned with Saudi Arabia’s Vision 2030 aspirations for economic diversification, carbon emission reduction, and sustainable development. Ceer is committed to designing, manufacturing, and supplying technologically sophisticated electric sedans and SUVs, leveraging advanced systems from Foxconn and BMW, all from its base of operations in King Abdullah Economic City, Saudi Arabia.
Related
-
Sturdee Energy and Upepo Energy Launch 200 MW Wind Project in Zambia
9 September 2026
-
Suzlon Wins Its First 200 MW Wind Order From Ayana Renewable Power
9 September 2026
-
Digital Realty launches 6.4MW data center in Nairobi, Kenya
9 September 2026
-
Hydro-Québec Aims to Triple Wind Power, Coalition Demands Moratorium
9 September 2026
-
Firmus to provide OpenAI with compute capacity in Malaysia
9 September 2026
-
Mistral raises €3bn in Series D led by Samsung Electronics
9 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2