Jacobs picked to manage decarbonisation of Europe’s largest steel mill
23 November 2023
US engineer Jacobs has been selected by ThyssenKrupp to manage the decarbonisation of Europe’s largest steel mill in Duisburg, western Germany.
The project involves substituting coke blast furnaces with hydrogen-powered electric smelters. When operational in 2026, the site will produce 2.5 million tonnes of direct reduced iron annually and reduce carbon emissions by up to 3.5 million tonnes a year.
ThyssenKrupp Steel Europe plans to become fully climate-neutral by 2045.
Jacobs’ role involves organising the engineering services, assembly and logistics, construction and interface management across the project teams.
Patrick Hill, Jacobs’ executive vice president, said: “Companies like ThyssenKrupp and Jacobs are leading the way in global climate transformation with a focus on decarbonising the industrial sector.
“This is a major project with a complex undertaking delivered through an integrated German and international team. The implementation of this emerging technology is an important step in transforming the industry and supply chain in Europe and beyond.”
Related
-
Uganda switches on 24 MW solar project
16 September 2026
-
Tender – Geophysical investigations for geothermal exploration in Brabant Massif, Belgium
16 September 2026
-
GE Vernova to supply 29.4 MW of wind capacity for Eurus Energy’s Hiyamizutouge Project in Japan
16 September 2026
-
Renewables in Europe: TotalEnergies Acquires Shell's Renewables Business and Sells a 50% Stake in a Portfolio of Developed Assets to KKR
15 September 2026
-
Germany: Nordex secures 34 MW order for Rauschenberg wind farm
15 September 2026
-
Sacyr selected for Second Concession of Route 57 Santiago - Colina - Los Andes in Chile
14 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2