Skanska constructs new STEM building in San Marcos, Texas, USA, for USD 100M, about SEK 1.1 billion
13 November 2023
Skanska has signed a contract with Texas State University System to build a new STEM (Science, Technology, Engineering, and Math) building located on The Texas State University System’s San Marcos campus in Texas, USA. The contract is worth USD 100M, about SEK 1.1 billion, which will be included in the US order bookings for the fourth quarter of 2023.
Skanska has signed a contract with Texas State University System to build a new STEM (Science, Technology, Engineering, and Math) building located on The Texas State University System’s San Marcos campus in Texas, USA. The contract is worth USD 100M, about SEK 1.1 billion, which will be included in the US order bookings for the fourth quarter of 2023.
The new building will be an eight-story, 14,500 square-meter (155,900 square-foot) structure that will house the Departments of Mathematics and Computer Science, and will provide teaching space, class labs, departmental offices, and research labs for several other academic disciplines. The project also requires site and utility improvements and upgrades to support the new building.
Construction is slated to begin in June 2024 and expected to reach completion in May 2026.
Related
-
Chinese firm signs $3.3bn Kuwait wastewater deal
30 July 2026
-
ACCIONA accelerates U.S. presence with the acquisition of 80% stake in Vertical Earth
29 July 2026
-
Masdar signs renewable deals with Montenegro’s state power utility
29 July 2026
-
Chinese contractor appointed for 500MW Oman solar plant
23 July 2026
-
Chinese firm wins Dubai drainage contract
21 July 2026
-
Chinese contractor wins Kuwait investment authority HQ
16 July 2026


京公网安备
11010802030424号
京ICP备19046776号-2