Skanska JV signs for US wastewater project
11 April 2022
Skanska will work with RJ Industries on the New York City Department of Environmental Protection contract at Hunts Point Wastewater Resource Recovery Facility in the Bronx. The total contract is worth US$309m (£237m) and Skanska's share is worth about US$248m (£190m).
The contract includes the installation of cast-in-place concrete, a prefabricated guardhouse and walkway bridges, electric, heating, ventilation and plumbing equipment, instrumentation and controls, site clearance, excavation and final landscaping.
Construction will begin this spring and is scheduled for completion in March 2026.
Related
-
Spain commits €340 million to Casablanca desalination plant
9 May 2025
-
US Ex-Im Bank lifts curbs on coal plant loans after Trump order
7 May 2025
-
Engie and Neom sign desalination brine deal
6 May 2025
-
Meta to buy environmental attributes from Sunraycer’s Texas solar projects
4 May 2025
-
Balfour Beatty lands $385m Miami hotel contract
1 May 2025
-
Skanska to build Sweden’s longest wooden bridge
30 April 2025