Turner Construction to build $800m data centre for Meta in Indiana
30 January 2024
Turner Construction has been selected to build a 700,000 sq ft data centre campus for Meta in Jeffersonville, Indiana.
The $800m development will contain a number of buildings, and will run entirely on renewable energy, with the aim of attaining LEED Gold certification.
Turner will use prefabricated modular assembly techniques during construction.
Some 1,250 construction employees will work on the site each day, and once operational the project will support 100 jobs.
Dan Harmon, Turner’s general manager, said: “We are excited to engage the community and begin work on another data centre project for Meta.
“Working with members of the community and great local and regional trade partners, we will build this sustainable data centre that will connect people to others and to resources and information around the globe.”
Construction on the project is due to begin in February 2024.
Related
-
Gamuda to develop 600MW wind and solar with BESS in Tasmania
4 July 2025
-
Hidroelectrica awards EUR 9.5 mln floating photovoltaic system in Romania
3 July 2025
-
Consortium wins Egypt desalination plant EPC contract
3 July 2025
-
Mozambique Grants Zambia Land for Dry Port Project in Nacala
2 July 2025
-
Madagascar signs deal to develop 50 MW of solar with 25 MWh of storage
2 July 2025
-
Globeleq’s Red Sands battery energy storage project reaches financial close
2 July 2025