Masdar signs Agreements for 1GW Wind and potential Green Hydrogen Plant in Jordan
7 December 2023
Abu Dhabi Future Energy Company PJSC – Masdar, the UAE’s clean energy powerhouse, has signed a joint development agreement with the Jordanian Ministry of Energy and Mineral Resources to develop a 1 gigawatt (GW) wind project with a battery energy storage system (BESS), and a memorandum to explore the feasibility of establishing a green hydrogen plant.
The agreements with the Ministry were signed at COP28 by Masdar Chief Executive Officer, Mohamed Jameel Al Ramahi and the Jordanian Minister of Energy and Mineral Resources, His Excellency Dr Saleh Al-Kharabsheh. The signing ceremony was witnessed by UAE Minister of Industry and Advanced Technology, COP28 President and Masdar Chairman, HE Dr Sultan Al Jaber and the Minister of the Environment for Jordan, H.E.Dr Muawieh Khalid Radaideh.
The study will examine the feasibility of establishing a green hydrogen project near The Port of Aqaba to produce the most cost-competitive hydrogen, utilizing desalinated seawater, and dedicated renewable power.
Masdar already has a presence in Jordan through its Baynouna Solar Energy Company (BSCE) joint venture with Finnish investment and asset management group Taaleri, which inaugurated the 200MW Baynouna Solar Park, the largest clean energy project in Jordan, in February of this year.
Masdar is pursuing a target of 1 million tonnes of green hydrogen production by 2030 as part of the UAE’s plans to establish itself as a green hydrogen hub and capture 25 per cent of the global low-carbon hydrogen market by 2030.
Related
-
Uganda switches on 24 MW solar project
16 September 2026
-
Tender – Geophysical investigations for geothermal exploration in Brabant Massif, Belgium
16 September 2026
-
GE Vernova to supply 29.4 MW of wind capacity for Eurus Energy’s Hiyamizutouge Project in Japan
16 September 2026
-
Renewables in Europe: TotalEnergies Acquires Shell's Renewables Business and Sells a 50% Stake in a Portfolio of Developed Assets to KKR
15 September 2026
-
Germany: Nordex secures 34 MW order for Rauschenberg wind farm
15 September 2026
-
Sacyr selected for Second Concession of Route 57 Santiago - Colina - Los Andes in Chile
14 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2