Jacobs to build $500m water treatment facility in Los Angeles
7 March 2023
US engineer Jacobs has won a design-and-build contract for a $500m water purification plant in Los Angeles.
The Donald C Tillman Advanced Water Purification Facility (AWPF) will gather and store groundwater at the city’s Hansen Spreading Grounds – a depression where surface water is allowed to percolate into the subsoil.
Microfiltration, reverse osmosis and ultraviolet oxidation will then be used to purify more than 15 million gallons a day.
The facility is intended to reduce the amount of water imported into Los Angeles, and will also treat tertiary effluent from the existing Donald C Tillman Water Reclamation Plant.
Jacobs is working on behalf of the LA Sanitation and Environment (LASAN) and the Los Angeles Department of Water and Power (LADWP).
The project has been awarded funding from the Water Infrastructure Finance and Innovation Act, which fast-tracks US investment through long-term, low-cost loans.
Ron Williams, Jacobs’ senior vice president, said: “Jacobs’ selection by LASAN and LADWP to help secure the city’s long-term water supplies with an advanced water purification facility is one of several transformative projects happening in the state to address drought concerns in California.
“Water scarcity is a growing issue across the globe. Taking this innovative and collaborative approach to tackle water shortages in Los Angeles offers a safe, sustainable and effective way to manage water resources and address water scarcity issues in the state.
Related
-
Envision Energy, AMEA Power sign deal for 500MW Egypt wind project
22 June 2026
-
Dubai selects groups for $22bn sewerage tunnel deals
15 June 2026
-
Montenegro’s CEDIS signs agreement with EDF, AFD on grid upgrade
12 June 2026
-
Consortium wins Ajman sewage treatment contract
11 June 2026
-
Saudi Arabia and Turkiye sign railway agreements
11 June 2026
-
PIF-owned Ardara tenders Al-Wadi sewer package
10 June 2026


京公网安备
11010802030424号
京ICP备19046776号-2