Bahrain invites bids for EPC of Associated Gas Compression Project Phase 7
22 November 2022
Tatweer Petroleum, Bahrain is undertaking a field development project to increase oil and associated gas production in the Bahrain Oil Field.
As a result of this program, the associated gas production is projected to increase to volumes that need to be accommodated by the associated gas handling network.
In order to accomplish this, expansion of the existing associated gas handling network by means of additional compression is required to further advance Tatweer Petroleum’s field development objectives.
Therefore, the Associated Gas Compression Phase 7 project aims to install three (3) new compression stations to increase the field’s total compression capacity and for enhanced oil recovery purposes.
The Scope of Work incudes Design, Procurement, Fabrication, Installation, Testing, Pre-Commissioning, Commissioning, and Start-Up of Three (3) Compression Stations CS12, CS13, & CS14.
At present, tender submission date is 25 December 2022.
Related
-
Chinese contractor wins $294m Iraq oil project
16 June 2025
-
Ivory Coast launches tenders for 200 MW/66 MWh of solar-plus-storage
12 June 2025
-
Denmark starts 3 GW offshore wind tenders to boost renewable energy
11 June 2025
-
Mexico to invest $6.6bn in airport upgrade programme
10 June 2025
-
World Bank restarts ambitious Inga 3 hydro scheme in DRC
10 June 2025
-
France concludes C&I rooftop PV tender with average price of €0.09753/kWh
4 June 2025