Egypt signs MoU with China’s SANY for 4GW wind turbine and energy project
26 June 2026
Egypt has signed a memorandum of understanding (MoU) with China's SANY Renewable Energy to establish the country's first wind turbine manufacturing facility and develop a wind power project in the Gulf of Suez.
The signing ceremony took place at the Cabinet headquarters in Egypt's New Administrative Capital in the presence of Prime Minister Mostafa Madbouly and was attended by Minister of Electricity and Renewable Energy Mahmoud Esmat, according to a post by the Ministry.
The MoU was signed by SANY Renewable Energy Chairman Li Qiang, Egyptian Electricity Transmission Company (EETC) Chairperson Mona Rizq and New and Renewable Energy Authority (NREA) Executive Chairman Ehab Ismail.
Under the agreement, SANY will establish a wind turbine manufacturing plant with an annual production capacity of 2 gigawatts (GW). The facility, which will be built to international standards, is expected to be completed within two years of the signing of the final agreements.
The 2GW wind power project, which will be financed in local currency, is expected to be connected to Egypt's national electricity grid within 23 months of the signing of the implementation agreement.
Related
-
CIP closes financing for 392MW Pestera II wind farm in Romania
26 June 2026
-
Infinity Power signs three agreements for renewable projects in Africa
25 June 2026
-
Zhejiang Construction International wins $265m Saudi hospital contract
24 June 2026
-
Envision Energy, AMEA Power sign deal for 500MW Egypt wind project
22 June 2026
-
Repsol and Masdar to partner in €849 million renewables portfolio in Spain
12 June 2026
-
Montenegro’s CEDIS signs agreement with EDF, AFD on grid upgrade
12 June 2026


京公网安备
11010802030424号
京ICP备19046776号-2