SPPC released RFQ for 5300MW solar and wind projects under NREP
16 September 2025
Saudi Power Procurement Company (Principal Buyer) has released a request for qualification (RFQ) for the seventh round of solar and wind projects under the National Renewable Energy Program (NREP), which is led and supervised by the Ministry of Energy.
Round Seven projects have a combined capacity of 5,300 MW and the projects are as follows:
Solar PV IPPs:
- The Tabarjal two Solar PV IPP in Al-Jouf Region with a capacity of 1,400 MW,
- The Mawqaq Solar PV IPP in Hail Region with a capacity of 600 MW,
- The Tathleeth Solar PV IPP in Aseer Region with a capacity of 600 MW,
- The South Al Ula Solar PV IPP in Madinah Region with a capacity of 500 MW,
Wind IPPs:
- The Bilghah Wind IPP in Madinah with a capacity of 1,300 MW
- The Shagran Wind IPP in Madinah with a capacity of 900 MW.
The Ministry of Energy–led NREP aims to harness Saudi Arabia’s abundant renewable resources and achieve an optimal energy mix for electricity, contributing to displacing high-value liquid fuels from the power generation sector.
The Principal Buyer is the entity responsible for preparing feasibility studies, tendering electricity generation projects, and signing power purchase agreements with developer consortia. To date, the Principal Buyer has launched renewable electricity generation projects with a total capacity of over 43 GW. Of these, power purchase agreements have been signed for projects with a total capacity of over 38 GW.
Related
-
Oil and gas discovery in the North Sea adding volumes to Oseberg
18 November 2026
-
Collaborating to develop challenging discoveries
18 November 2026
-
Equinor, Aker BP and Vår Energi join forces to search for Norway’s next major discoveries
18 November 2026
-
Further development of Johan Sverdrup
18 November 2026
-
CO₂ research project “catch4climate” officially inaugurated with 200 guests from politics and industry
18 November 2026
-
LA ABC, GOBERNACIÓN Y TRANSPORTE ACUERDAN REINICIAR TRABAJOS DE SELLADO DE JUNTAS, BERMAS Y MANTENIMIENTO CONSTANTE EN EL DESVÍO PARA REACTIVAR LA DOBLE VÍA ORURO – CHALLAPATA
18 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2