GE Vernova strengthens German wind energy expansion with new order from wpd
18 November 2026
Salzbergen, Germany, (November 17, 2026) – GE Vernova (NYSE: GEV) announced today that it has signed an agreement with wpd to supply four of its 5.5 MW-158m onshore wind turbines for the Haseloff wind farm in Germany. The order includes a long-term service agreement, underscoring the commitment of both companies to supporting Germany’s ambitious renewable energy goals.
This marks the fifth project collaboration between the two companies using GE Vernova’s 6 MW class wind turbines, bringing wpd’s fleet of these workhorse turbines in Germany to 24, with a combined installed capacity of 132 MW. The delivery of the turbines is set to begin in November 2027, with commissioning scheduled for the first quarter of 2028.
"We are proud to continue our successful relationship with wpd, a company that shares our vision for a resilient and sustainable energy future," said Marcas Breatnach, Executive Sales Leader Northern Europe at GE Vernova. "With our proven workhorse technology, available with ratings up to 6.5 MW and proudly manufactured at our Salzbergen facility, we deliver high-performance, mature technology backed by over 38 million operating hours across more than 2,100 units worldwide. Our local production strengthens a resilient supply chain and supports Germany’s energy transition with highly industrialized, reliable turbines made in Germany."
GE Vernova’s facility in Salzbergen remains a cornerstone of GE Vernova’s German footprint and celebrated a major milestone in May 2026 by reaching 25 GW of total produced wind power capacity. The site underscores GE Vernova’s deep commitment to the German market, where the company operates across 13 locations, providing a diverse energy transition footprint. This includes a transformer manufacturing facility in Mönchengladbach as well as other grid related production and R&D facilities.
This agreement builds on GE Vernova’s growing momentum in Germany, following its recently announced order from Stadtwerke Heidenheim AG for three onshore wind turbines.
GE Vernova's onshore portfolio reflects a deliberate workhorse strategy — standardized, industrialized machines engineered for repeatable execution and long-term reliability. With more than 59,000 turbines operating globally, its experience informs every product it designs, manufactures, and deploys.
Related
-
B5Plus Group selects Danieli Centro Combustion for reheating furnace at new long-product complex
17 November 2026
-
Contract awards for four development projects on the Norwegian continental shelf
17 November 2026
-
Conclusion of Option Agreement for Non-ferrous Metal Joint Exploration Project in Manitoba, Canada
17 November 2026
-
Aibel awarded contract for Wisting
17 November 2026
-
GeZero: Implementation of the CO₂ capture project paused – Geseke site remains important
17 November 2026
-
Con crédito del BID se instalará 70 mil luminarias LED en seis departamentos para beneficio de un millón de personas
17 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2