Philippine province approves 300 MW of solar
2 April 2025
A 300 MW solar project has been approved in the barangays of Bacsil and Mumulaan, located in Ilocos Norte, northern Philippines.
The provincial board has unanimously approved the installation, which will be developed by Manila-based Opus Solar Energy Corp.
The project will occupy at least 200 hectares of forest land chosen by the Department of Environment and Natural Resources.
The Philippine Board of Investments (BOI) will grant the project a green lane certification, streamlining the approval and registration process to expedite its development.
The BOI has now registered 184 projects under the green lane program since its launch in February 2023, according to the Philippine News Agency.
The Philippines had 2.97 GW of cumulative installed solar capacity by the end of 2024, up from 1.8 GW in 2023, according to the latest data from the International Renewable Energy Agency (IRENA).
Related
-
COOEC wins Saudi Aramco offshore gas contract
14 April 2026
-
Egypt signs contracts worth $740m for two chemical projects
12 April 2026
-
Bahrain approves $340m highway financing
11 April 2026
-
Croatia tenders 56 MW solar-storage project
9 April 2026
-
Saudi firm to develop $300m Syria Beaumont project
9 April 2026
-
Kairos taps Power China for P13-b Iloilo wind farm
8 April 2026


京公网安备
11010802030424号
京ICP备19046776号-2