Uganda opens tender for 40 MW of ground-mounted solar
6 February 2025
TotalEnergies Uganda is seeking a contractor for two 20 MW ground-mounted solar plants in Uganda.
The installations, which will be built in the Iganga and Tororo districts in eastern Uganda, are grid-connected turnkey projects.
The contractor will handle engineering, procurement, and construction, as well as operations and maintenance for at least two years post-commissioning, for a maximum of 20 years.
Interested contractors must request a pre-qualification questionnaire by email by Feb. 21, 2025, and meet eligibility requirements outlined in the tender document.
The final deadline for submitting expressions of interest is Feb. 28, 2025.
Uganda had deployed 95 MW of solar by the end of 2023, which is the same level reported in 2022, according to figures from the International Renewable Energy Agency (IRENA).
Related
-
Meta to build C$13bn data centre in Canada
10 July 2026
-
Morocco tenders 300MW El-Menzel pumped-storage plant
7 July 2026
-
Contractors submit bids for QatarEnergy urea facility expansion
6 July 2026
-
Oman awards $2.3bn water services contract
2 July 2026
-
L&T wins feed contract for Oman green steel project
2 July 2026
-
Japan’s Obayashi acquires UK’s Multiplex for $540m
1 July 2026


京公网安备
11010802030424号
京ICP备19046776号-2