Trinasolar powers Arabian Peninsula with 70MW plant
9 August 2024
Trinasolar has announced the completion and inauguration of a 70MW PV power station in the Arabian Peninsula, deploying its advanced Vertex N 720W (NEG21C.20) series modules.
“The successful completion of this solar plant is testament to our commitment to advancing renewable energy solutions in challenging environments,” commented Zhao Lei, Trina’s headof strategic key accounts. “The Vertex N 720W series modules not only deliver exceptional performance and reliability but also embody our mission to drive sustainable energy practices both regionally and globally.”
Despite its vast desert area, the Arabian Peninsula is now embracing solar power, a strategic direction aligning with its focus on energy transition and highlighting the importance of photovoltaic projects in optimizing the energy supply.
Related
-
Syria signs agreement with Acwa Power for 2.5GW renewables
5 September 2025
-
Chinese manufacturer plans solar glass factory in Algeria
4 September 2025
-
Malaysia approves 2 GW of large-scale solar
4 September 2025
-
Oman offers four mining concessions to investors
4 September 2025
-
Azerbaijan, Chinese PV firm plan export-focused solar factory in free zone
4 September 2025
-
Ferrovial to develop 250 MW solar facility in Texas
1 September 2025