Six investors planning PV panels or battery plants compete for EUR 200 mln grants in Romania
8 June 2024
A number of six bidders submitted projects to get grant financing under a EUR 200 million grant scheme operated by Romania and aimed at supporting the development of PV panels and power storage battery plants, Profit.ro reported.
The scheme is financed by the National Resilience Facility (PNRR), and the projects should be completed by mid-2026. The factories should manufacture, assemble, or recycle PV panels or power storage batteries.
Out of the total budget, EUR 150 million is dedicated to supporting the development of PV panel plants, and the rest of EUR 50 million to factories for power storage batteries.
The scheme aims to result in the development of battery production/assembly/recycling with a combined capacity of at least 2 GW/year, respectively a combined capacity of 200 MW/year for the manufacturing/assembly/recycling of PV panels.
Related
-
Ports Regulator’s integration into emerging Transport Economic Regulator targeted for January 2027
18 November 2026
-
Italy surpasses 1 million renewable-linked battery storage systems
18 November 2026
-
Poland awards 1.81 GW of solar in latest renewables auctions
18 November 2026
-
OMV Petrom: Progress on the Neptun Deep project: the offshore production platform has been installed in the Black Sea
17 November 2026
-
Vietnam’s energy security under pressure as net energy imports near 44%
17 November 2026
-
Reservas probadas de gas natural en Bolivia caen a 2,3 TCF, el más bajo nivel registrado en dos décadas
17 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2