Flatiron joint venture to build $446m Texas bus route
24 May 2024A joint venture between Colorado contractor Flatiron and Missouri infrastructure specialist Herzog has been selected to build a 19km, $446m bus route in Texas.
The two were selected by the VIA Metropolitan Transit Authority of San Antonio to build the North–South Corridor Advanced Rapid Transit project, also known as the Green Line. This will add 26 bus stops, dedicated bus lanes and improved connectivity to the city’s airport and downtown.
Flatiron notes that bus corridors have become increasingly popular in North America, due to their low costs, flexible service options and rapid build speed.
The joint venture will work with local, small and disadvantaged businesses.
Dale Nelson, Flatiron’s executive vice president for operations, said: “This transformational project will connect San Antonio’s vibrant communities while providing an efficient route through the heart of the city.
“The Green Line will speed residents to major employment centres and enhance affordable access to medical facilities and other necessities of daily life.”
Construction is due to begin in early 2025.

Related
-
Tender issued for Libyan gas project
19 September 2026
-
Zambia inks PPA for 500 MW solar project
19 September 2026
-
reNIKOLA and Syarikat SESCO Sign 363 MWp Solar PPA in Sarawak
18 September 2026
-
Metito wins O&M contract for Dubai South Sewage project
18 September 2026
-
Aldar and Mubadala acquire Masdar City Square
18 September 2026
-
China’s Sinoma wins Ras Al-Khaimah cement plant contract
18 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2