Flatiron joint venture to build $446m Texas bus route
24 May 2024A joint venture between Colorado contractor Flatiron and Missouri infrastructure specialist Herzog has been selected to build a 19km, $446m bus route in Texas.
The two were selected by the VIA Metropolitan Transit Authority of San Antonio to build the North–South Corridor Advanced Rapid Transit project, also known as the Green Line. This will add 26 bus stops, dedicated bus lanes and improved connectivity to the city’s airport and downtown.
Flatiron notes that bus corridors have become increasingly popular in North America, due to their low costs, flexible service options and rapid build speed.
The joint venture will work with local, small and disadvantaged businesses.
Dale Nelson, Flatiron’s executive vice president for operations, said: “This transformational project will connect San Antonio’s vibrant communities while providing an efficient route through the heart of the city.
“The Green Line will speed residents to major employment centres and enhance affordable access to medical facilities and other necessities of daily life.”
Construction is due to begin in early 2025.
Related
-
Algeria awards $500mln steel deal to Chinese firm
6 June 2025
-
Comfily Hong Kong to establish $20mln integrated industrial complex in Egypt
6 June 2025
-
EIB to provide €400m loan for Stockholm metro expansion
6 June 2025
-
Barrick seeks World Bank arbitration on government takeover of Mali mine
5 June 2025
-
Hassan Allam-Metito JV awarded Alexandria West WWTP expansion in Egypt
5 June 2025
-
PKKP and Rio Tinto sign co-management deal for iron ore operations
5 June 2025