Flatiron joint venture to build $446m Texas bus route
24 May 2024A joint venture between Colorado contractor Flatiron and Missouri infrastructure specialist Herzog has been selected to build a 19km, $446m bus route in Texas.
The two were selected by the VIA Metropolitan Transit Authority of San Antonio to build the North–South Corridor Advanced Rapid Transit project, also known as the Green Line. This will add 26 bus stops, dedicated bus lanes and improved connectivity to the city’s airport and downtown.
Flatiron notes that bus corridors have become increasingly popular in North America, due to their low costs, flexible service options and rapid build speed.
The joint venture will work with local, small and disadvantaged businesses.
Dale Nelson, Flatiron’s executive vice president for operations, said: “This transformational project will connect San Antonio’s vibrant communities while providing an efficient route through the heart of the city.
“The Green Line will speed residents to major employment centres and enhance affordable access to medical facilities and other necessities of daily life.”
Construction is due to begin in early 2025.

Related
-
Chinese firm announces $1.9bn Abu Dhabi renewables contract
24 March 2026
-
Kuwait tenders major infrastructure packages
23 March 2026
-
Uzbekistan, China’s ZTE Sign Cooperation Deal on Telecom and Data Centers
23 March 2026
-
Webuild signs MoU with Hyundai E&C to target infrastructure projects
23 March 2026
-
Danantara opens second tender round for waste-to-energy projects
18 March 2026
-
GE Vernova and Hitachi target South East Asia for BWRX-300 SMR
18 March 2026


京公网安备
11010802030424号
京ICP备19046776号-2