Fluor JV starts work on $700m Texas highway project
22 May 2024
A joint venture between Fluor and Austin Bridge and Road has broken ground on the first phase of the Interstate 35 (I-35) Northeast Expansion South in San Antonio, Texas.
The team, known as the Lone Star Constructors, won the $700m contract from the Texas Department of Transportation (TxDOT) in 2023.
It involves building three elevated lanes in each direction from the I-35/I-410 South interchange to the I-35/I-410 North interchange along I-35.
The project also includes a five-year capital maintenance period, with the option of two five-year extensions.
Shawn West, President of Fluor’s Infrastructure arm, said: “Phase 1 of the I-35 NEX South project builds on Fluor’s more than two decades of work helping TxDOT improve safety and vehicular mobility across the state.
“This project reinforces Fluor’s commitment to deliver quality infrastructure and supports economic development and commerce in Texas.”
The I-35 corridor currently accommodates 150,000 vehicles per day.
The project is due to be substantially completed in early 2028.
Related
-
Sabey Data Centers signs 10-year Texas solar agreement covering 43.5 MW
19 November 2026
-
$900bn Anthropic Data Centre Construction Bet Shapes AI Infrastructure Expansion
19 November 2026
-
$785M Los Alamos Computing Facility advances towards construction approval in University of Michigan
19 November 2026
-
Intermountain Health Breaks Ground on New 521,000-Square-Foot LDS Hospital in Salt Lake City
19 November 2026
-
Oil and gas discovery in the North Sea adding volumes to Oseberg
18 November 2026
-
Collaborating to develop challenging discoveries
18 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2