Fluor JV starts work on $700m Texas highway project
22 May 2024
A joint venture between Fluor and Austin Bridge and Road has broken ground on the first phase of the Interstate 35 (I-35) Northeast Expansion South in San Antonio, Texas.
The team, known as the Lone Star Constructors, won the $700m contract from the Texas Department of Transportation (TxDOT) in 2023.
It involves building three elevated lanes in each direction from the I-35/I-410 South interchange to the I-35/I-410 North interchange along I-35.
The project also includes a five-year capital maintenance period, with the option of two five-year extensions.
Shawn West, President of Fluor’s Infrastructure arm, said: “Phase 1 of the I-35 NEX South project builds on Fluor’s more than two decades of work helping TxDOT improve safety and vehicular mobility across the state.
“This project reinforces Fluor’s commitment to deliver quality infrastructure and supports economic development and commerce in Texas.”
The I-35 corridor currently accommodates 150,000 vehicles per day.
The project is due to be substantially completed in early 2028.
Related
-
Foster + Partners designs “green oasis” for Seoul
21 August 2025
-
Egypt, China’s Ankura discuss localizing high-voltage cable industry
20 August 2025
-
Masdar and consortium partners achieve financial close for 2GW Al Sadawi Solar Project
20 August 2025
-
Dubai hosts second meeting with $22bn tunnels bidders
20 August 2025
-
Saudi Arabia announces pre-qualified companies for highway PPP Project
19 August 2025
-
SEC awards 1,000 MW battery energy storage system projects
18 August 2025