Fluor JV starts work on $700m Texas highway project
22 May 2024
A joint venture between Fluor and Austin Bridge and Road has broken ground on the first phase of the Interstate 35 (I-35) Northeast Expansion South in San Antonio, Texas.
The team, known as the Lone Star Constructors, won the $700m contract from the Texas Department of Transportation (TxDOT) in 2023.
It involves building three elevated lanes in each direction from the I-35/I-410 South interchange to the I-35/I-410 North interchange along I-35.
The project also includes a five-year capital maintenance period, with the option of two five-year extensions.
Shawn West, President of Fluor’s Infrastructure arm, said: “Phase 1 of the I-35 NEX South project builds on Fluor’s more than two decades of work helping TxDOT improve safety and vehicular mobility across the state.
“This project reinforces Fluor’s commitment to deliver quality infrastructure and supports economic development and commerce in Texas.”
The I-35 corridor currently accommodates 150,000 vehicles per day.
The project is due to be substantially completed in early 2028.
Related
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Saudi Arabia qualifies developers for renewable projects
9 January 2026
-
Consultant appointed for Qatar-Bahrain causeway study
7 January 2026
-
Vestas gets 390MW wind turbine order in South Korea
5 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2