Flatiron JV wins $450m Triangle Expressway extension
2 March 2024
A joint venture of Flatiron, Fred Smith Company, and designer ICE of the Carolinas has won the $449.9m Triangle Expressway Southeast Extension project in North Carolina.
It will add 6.6 miles of new highway and three new interchanges.
It’s the third contract for Flatiron on the Triangle Expressway.
Working for the North Carolina Turnpike Authority, the joint venture will first carry out design and preconstruction planning for the extension.
It will then design and build a six-lane divided highway to extend the Triangle Expressway from Rock Quarry Road in Raleigh to US 64/I-87.
The work includes:
- New interchanges at Rock Quarry Road, Auburn Knightdale Road, and Poole Road;
- 19 new bridges including some 1,600 feet of dual bridges over the Neuse River;
- Rehabilitating and widening the I-540 bridge over I-87; and
- Realigning the existing Neuse River Trail.
Flatiron said the design approach includes an “over-under” direct-connector ramp for southbound I-87 to westbound NC-540 traffic. This will cut costs and speed up construction, the company said.
The team has also been able to design out 1.3 million cubic yards of planned earthworks.
Flatiron is currently constructing two other segments of the NC 540 Raleigh Outer Loop as the lead partner in a joint venture with Branch Civil.
Related
-
Xinyi Glass signed glass production project with Saudi’s MODON
15 January 2026
-
Engie wins SECI bid for 200MW solar PV-600MWh battery project in India
15 January 2026
-
Webuild-led team lands Riyadh Red Line extension
14 January 2026
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Chinese contractor wins Wasl Jumeirah Golf Estates deal
11 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2