Bahrain invites Bids of 100MW Al Dur Solar Power Project
8 February 2024
The Electricity and Water Authority (EWA), Bahrain intends to implement a project to Establish Solar Power Stations at Al Dur area in the Southern Governorate of the Kingdom of Bahrain.
The establishment of this project is in line with the National Goals of diversifying and sustaining energy resources for achieving the goals of the energy transformation plan in Bahrain.
The expected production capacity of the project is between 90 and 100 megawatts.
The tender for construction works of the Project will be implemented on Turnkey basis which includes Engineering, Design, Manufacturing, Supply of materials, Installation, Testing & commissioning and Civil & Electromechanical works as well as the connection of the stations to EWAs Electricity Transmission network.
The project implementation period is 18 months from the date of Award of the tender.
At present, Bid Submission is 03 April 2024.
For the latest updates, please join WhatsApp Channel, Google News
Related
-
Tenergie secures €150 million financing for 350 solar projects
29 August 2026
-
Greenvolt secures funding from UniCredit for BESS projects in Poland
29 August 2026
-
Greenvolt Secures Financing Package from Unicredit for its Ełk and Turośń BESS Projects in Poland
29 August 2026
-
Butec wins Casablanca waste-to-energy contract
28 August 2026
-
UAE’s Masdar starts operations at 35MW/70MWh UK battery storage project
28 August 2026
-
Wabag secures DBO contract for desalination project in Kuwait
27 August 2026


京公网安备
11010802030424号
京ICP备19046776号-2