Bahrain invites Bids of 100MW Al Dur Solar Power Project
8 February 2024
The Electricity and Water Authority (EWA), Bahrain intends to implement a project to Establish Solar Power Stations at Al Dur area in the Southern Governorate of the Kingdom of Bahrain.
The establishment of this project is in line with the National Goals of diversifying and sustaining energy resources for achieving the goals of the energy transformation plan in Bahrain.
The expected production capacity of the project is between 90 and 100 megawatts.
The tender for construction works of the Project will be implemented on Turnkey basis which includes Engineering, Design, Manufacturing, Supply of materials, Installation, Testing & commissioning and Civil & Electromechanical works as well as the connection of the stations to EWAs Electricity Transmission network.
The project implementation period is 18 months from the date of Award of the tender.
At present, Bid Submission is 03 April 2024.
For the latest updates, please join WhatsApp Channel, Google News
Related
-
Korean bank backs Guam’s largest solar project
28 December 2025
-
Masdar completes first project in £1 Billion UK BESS investment and announces project pipeline
26 December 2025
-
Masdar signs PPA for 200 MW floating solar project in Malaysia
25 December 2025
-
Mubadala teams up with Actis to invest in Rezolv Energy
25 December 2025
-
Saeta Yield closed €340 million refinancing and secures €200 million RCF in Europe
25 December 2025
-
TotalEnergies sells half of 424 MW portfolio in Greece
24 December 2025


京公网安备
11010802030424号
京ICP备19046776号-2