Zambian utility launches EPC tender for 7.5 MW of solar
6 February 2024
Zesco has opened a tender for an EPC contract for a 7.5 MW on-grid solar plant. The deadline for expressions of interest is Feb. 16, 2024.
The plant will be built in Kasupe, Lusaka province. Zesco owns 35 hectares of unused land in Kasupe, which have been set aside for the development of renewable energy projects.
According to the tender advertisement, Zesco wants to develop smaller distributed PV plants to help the country harness renewable sources of energy, achieve diversification, and enhance the energy mix. The utility's website says it plans to increase its power generation mix with a minimum of 1,800 MW of renewable energy over the next 10 years.
Figures from the International Renewable Energy Agency (IRENA) show that Zambia had 96 MW of installed solar power at the end of 2021. The government previously set a target of deploying 500 MW of solar by 2023, in order to ease chronic power shortages.
Related
-
Strabag buys Romanian firm to target European rail infrastructure
19 June 2026
-
Sembcorp concludes Alinta Energy acquisition for $4.32bn
15 June 2026
-
Repsol and Masdar to partner in €849 million renewables portfolio in Spain
12 June 2026
-
Montenegro’s CEDIS signs agreement with EDF, AFD on grid upgrade
12 June 2026
-
Consortium wins Ajman sewage treatment contract
11 June 2026
-
Saudi Arabia and Turkiye sign railway agreements
11 June 2026


京公网安备
11010802030424号
京ICP备19046776号-2