Zambian utility launches EPC tender for 7.5 MW of solar
6 February 2024
Zesco has opened a tender for an EPC contract for a 7.5 MW on-grid solar plant. The deadline for expressions of interest is Feb. 16, 2024.
The plant will be built in Kasupe, Lusaka province. Zesco owns 35 hectares of unused land in Kasupe, which have been set aside for the development of renewable energy projects.
According to the tender advertisement, Zesco wants to develop smaller distributed PV plants to help the country harness renewable sources of energy, achieve diversification, and enhance the energy mix. The utility's website says it plans to increase its power generation mix with a minimum of 1,800 MW of renewable energy over the next 10 years.
Figures from the International Renewable Energy Agency (IRENA) show that Zambia had 96 MW of installed solar power at the end of 2021. The government previously set a target of deploying 500 MW of solar by 2023, in order to ease chronic power shortages.
Related
-
OETC plans 51 power transmission projects across Oman by 2029
23 May 2025
-
Kuwait launches tender for 500 MW of solar
22 May 2025
-
Korea National Railway to advise Poland on high-speed rail
22 May 2025
-
Bosnia and Herzegovina breaks ground on 125 MW solar plant
22 May 2025
-
Adnoc signs $60bn of agreements with US companies
21 May 2025
-
Oman reveals qualified bidders for 2.4GW power projects
21 May 2025