QatarEnergy awards $6 Billion EPC Contracts
1 February 2024
QatarEnergy has announced the award of the four main Engineering, Procurement, Construction, and Installation (EPCI) contract packages related to the next development phase of the offshore Al-Shaheen field (Qatar’s largest oil field) to increase production by about 100,000 barrels of oil per day (BPD).
The award is part of Project Ru’ya (vision in Arabic), which is the third phase of Al-Shaheen’s development since North Oil Company, a joint venture between QatarEnergy (70%) and TotalEnergies (30%), took over the field’s operation in July 2017.
Project Ru’ya, which will develop more than 550 million barrels of oil, will be executed over a period of 5 years with first oil expected in 2027. The project includes the drilling of more than 200 wells and the installation of a new centralized process complex, nine remote wellhead platforms, and associated pipelines.
The four EPC packages, with varying scopes of work, valued in total at more than six billion dollars, comprise of:
His Excellency Mr. Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of QatarEnergy, welcomed the award of the contract packages as an important milestone in the development of the State of Qatar’s largest oil field. His Excellency said: “By awarding these contracts, we are taking an important step towards realizing the full potential of Al-Shaheen filed, which produces around half of Qatar’s crude oil today.”
His Excellency Minister Al-Kaabi added: “I would like to thank North Oil Company and our longtime strategic partner TotalEnergies for their great efforts towards unlocking the true potential of Qatar’s hydrocarbon resources and maximizing value from Al-Shaheen field through the implementation of world-class development and operational excellence programs.”
Al-Shaheen field is located 80 kilometres offshore Qatar and is among the world’s largest in terms of “oil in place”. The field commenced commercial production in 1994 and underwent significant development to reach an oil production rate of 300,000 bpd in 2007.
Related
-
Developers appoint contractor for $500m wastewater treatment project
16 February 2026
-
Acciona to build São Paulo road for €334m
14 February 2026
-
Alstom and Terna team win €992m Romania rail contract
14 February 2026
-
VinSpeed teams up with Siemens Mobility for Vietnam high-speed rail project
12 February 2026
-
Axpo, Enhol sign ten-year PPA for 3.7TWh in Spain
12 February 2026
-
Vinci lands €144m Jamaica water job
10 February 2026


京公网安备
11010802030424号
京ICP备19046776号-2