Albania: OSSH launched tender for power line overhaul
23 January 2024
Albanian transmission system operator OSSH has opened a public call for a project for the reconstruction of a low-voltage electricity line in the municipality of Bulqiza, valued at 279 million leks (2.7 million euros).
Prospective bidders should be able to complete the power line overhaul using weather-insulated cables within a 310-day timeframe, OSSH said in a tender notice.
Offers can be submitted until February 2.
Related
-
Norway invites bids for 1.5GW of floating wind project
20 May 2025
-
Sumitomo to acquire 30% stake in Rio Tinto’s Winu project in Australia
20 May 2025
-
New Murabba seeks consortiums for Mukaab project
20 May 2025
-
India plans 50 MW floating solar plant at nuclear site
19 May 2025
-
Vestas and LM Wind Power sign deal for blades factory in Poland
18 May 2025
-
PIF’s Joint Venture with Hyundai Motor Company, Hyundai Motor Manufacturing Middle East, celebrates groundbreaking milestone
18 May 2025