Greece and Bulgaria to increase capacity of electricity, gas transmission networks
19 January 2024
Greece and Bulgaria have signed a Memorandum of Understanding (MoU), which envisages increasing the transmission capacity of the electricity and gas networks, according to Bulgaria’s energy ministry.
The two countries also agreed on building and expanding hydrogen transmission networks, optimizing the use of energy production potential from renewables, developing hydrogen technologies and digitization of electricity networks.
The agreement is valid for three years, with provisions for possible extensions.
It is also aimed at ensuring a just transition to a decarbonized and climate-neutral economy.
Greece and Bulgaria are in particular bound by the IGB gas interconnector with an initial capacity of 3 billion cubic meters.
The IGB gas pipeline connects with the Greek national gas transmission system (DESFA S.A.) and the Trans-Adriatic gas pipeline (TAP AG) in the area of Komotini (Greece), and with the Bulgarian gas transmission system (Bulgartransgaz EAD) in the area of Stara Zagora. The total length of the gas pipeline is 182 km, the diameter of the pipe – 32” – and a design capacity of up to 3 billion m3/year in the direction of Greece – Bulgaria. Depending on the market interest for larger capacity and the possibilities of the neighboring gas transmission systems, the capacity of IGB is designed with the option for an increase of up to 5 billion m3/year with additional construction of a compressor station.
Related
-
Iraq hit by nationwide electricity blackouts
6 March 2026
-
EU opens third cross-border solar tender
6 March 2026
-
Greece to open applications for 130 MW agrivoltaics plan
5 March 2026
-
Philippines mandates energy storage for renewables plants over 10 MW
2 March 2026
-
Croatia prepares first bioeconomy strategy
13 January 2026
-
India mandates 20% domestic content in battery storage projects
5 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2