SEC, Emaar EC Signs Agreements for Power Supply of KAEC Phase 2,3
10 January 2024
Saudi Electricity Co.(SEC) and its subsidiary National Grid SA signed two agreements with Emaar The Economic City (Emaar EC), the main developer of King Abdullah Economic City (KAEC), to provide power services. SEC will supply power to the second and third phases of the KAEC project.
The first agreement aims to connect the main substation in KAEC with the general system network of National Grid.
The second agreement is to supply power for the modern international industrial projects specializing in the manufacture of electric vehicles, in the third phase of the Industrial Valley of KAEC, including the factories of CEER and Lucid.
Related
-
Miahona pens deals for water infrastructure projects in Uzbekistan
12 September 2025
-
Hyundai Rotem keen on developing high-speed railways in Vietnam
12 September 2025
-
Hanoi approved plan to build the fifth metro line
12 September 2025
-
Saudi Arabia issues tenders for two PPP water projects
12 September 2025
-
Consortium wins $500m Saudi wastewater treatment project
11 September 2025
-
Romania’s Electrica and Romgaz to partner on 400 MW green power projects
10 September 2025