CJIC won the China-Aid Well Drilling & Water Supply Project in South Sudan

9 November 2023

The project is an EPC project and the construction period is 12 months. Under the project, 47 boreholes are to be drilled in the Central Equatoria State and the Lakes State, 32 of which with the solar powered water pump and 15 with the hand pump installed.

to
TOP