CJIC won the China-Aid Well Drilling & Water Supply Project in South Sudan
9 November 2023
The project is an EPC project and the construction period is 12 months. Under the project, 47 boreholes are to be drilled in the Central Equatoria State and the Lakes State, 32 of which with the solar powered water pump and 15 with the hand pump installed.
Related
-
On behalf of His Majesty King Abdullah II, His Royal Highness Prince Faisal bin Al Hussein lays the Foundation Stone for the National Water Conveyance Project, with Arab Contractors’ Participation
19 November 2026
-
BLM receives $7.7M in winning bids in Idaho geothermal lease sale
18 November 2026
-
Webuild selected as successful proponent for Gabba Entertainment and Housing Precinct as part of Gather Brisbane Consortium
17 November 2026
-
Jereh wins $392m Bu Hasa oil field facilities project
17 November 2026
-
Penang Strait metro bridge contact awarded
14 November 2026
-
Jacobs to manage $2.1bn New Zealand highway corridor
13 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2