Gilbane awarded $114 million contract for water distribution system project
30 October 2026
Gilbane Building’s Federal Division has been awarded a $114 million contract by the U.S. Coast Guard to modernize the water distribution system at Base Kodiak, Alaska. Awarded Oct. 29, 2026, the contract will strengthen operational readiness and quality of life at the Coast Guard’s largest operational installation.
Base Kodiak serves as a vital hub for Coast Guard operations across Alaska and the Arctic. The project includes the design and construction work needed to modernize Base Kodiak’s water distribution system.
“Every day, the Coast Guard delivers value to our Nation by controlling, securing, and defending our northern border and maritime approaches in the Arctic,” said Rear Adm. Jon Hickey, Deputy Commandant for Systems. “Our crews need modern, resilient shore capabilities to answer the call and get the mission done. By investing $114 million to modernize Base Kodiak’s critical water and fire-suppression infrastructure, we are directly supporting our forces and their families while building the foundation for our expanding polar fleet and long-term mission readiness.”
Project highlights include:
- Water distribution system: Replacement and upgrades to more than eight miles of main water distribution lines across Base Kodiak.
- Storage Capacity: Replacement of four large-scale water storage tanks critical to base operations.
- Aviation and Facility Fire suppression: Reliable water supply and pressure for fire suppression systems protecting two operational aircraft hangars and other key shore facilities.
- Quality of life: Safe, dependable drinking water for Coast Guard personnel, civilian employees and families living and working on base.
“The Coast Guard and its families depend on safe, reliable infrastructure every day,” said Scott Orr, Sr. Vice President and Federal US Business Leader, Gilbane Building. “Our team understands the responsibility that comes with delivering critical infrastructure at an active installation. We are committed to bringing the technical expertise, collaboration and care needed to support the Coast Guard’s mission at Base Kodiak.”
Base Kodiak is designated as the future homeport for the Coast Guard’s first two Arctic Security Cutters. The water distribution modernization supports broader infrastructure investments planned or underway at the installation, including a new fuel pier, cargo wharf upgrades, additional family housing and a new child development center.
Related
-
Oil and gas discovery in the North Sea adding volumes to Oseberg
18 November 2026
-
Collaborating to develop challenging discoveries
18 November 2026
-
Equinor, Aker BP and Vår Energi join forces to search for Norway’s next major discoveries
18 November 2026
-
Further development of Johan Sverdrup
18 November 2026
-
CO₂ research project “catch4climate” officially inaugurated with 200 guests from politics and industry
18 November 2026
-
LA ABC, GOBERNACIÓN Y TRANSPORTE ACUERDAN REINICIAR TRABAJOS DE SELLADO DE JUNTAS, BERMAS Y MANTENIMIENTO CONSTANTE EN EL DESVÍO PARA REACTIVAR LA DOBLE VÍA ORURO – CHALLAPATA
18 November 2026


京公网安备
11010802030424号
京ICP备19046776号-2