Qatar invites bids for Expansion of Strategic Projects – Substations and Cables
9 November 2023
The Qatar General Electricity and Water Corporation “KAHRAMAA” invites bids for the Expansion of Strategic Projects – Substations and Cables.
The Project involves EPC Contract for establishment of new Substations and Cables of different voltage levels – from 66kV to 220 kV and upgrade/modifications of the existing substations.
The project is divided into several packages as described below:
- Substations Package S1: New 132kV Substations and upgrade of existing substation.
- Package S2: New 132kV and 66kV Substations.
- Package S3: New 220kV Substation, and upgrade of existing 400kV and 220kV substations.
- Cables Package C1 & C3: 132kV Cables.
- Package C2: 220kV Cables Package
- OHL: Modifications of existing OH Lines to connect new cables.
At present bid submission date is 21 December 2023.
Related
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Saudi Arabia qualifies developers for renewable projects
9 January 2026
-
Consultant appointed for Qatar-Bahrain causeway study
7 January 2026
-
Vestas gets 390MW wind turbine order in South Korea
5 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2