Qatar invites bids for Expansion of Strategic Projects – Substations and Cables
9 November 2023The Qatar General Electricity and Water Corporation “KAHRAMAA” invites bids for the Expansion of Strategic Projects – Substations and Cables.
The Project involves EPC Contract for establishment of new Substations and Cables of different voltage levels – from 66kV to 220 kV and upgrade/modifications of the existing substations.
The project is divided into several packages as described below:
- Substations Package S1: New 132kV Substations and upgrade of existing substation.
- Package S2: New 132kV and 66kV Substations.
- Package S3: New 220kV Substation, and upgrade of existing 400kV and 220kV substations.
- Cables Package C1 & C3: 132kV Cables.
- Package C2: 220kV Cables Package
- OHL: Modifications of existing OH Lines to connect new cables.
At present bid submission date is 21 December 2023.
Related
-
Gamuda to develop 600MW wind and solar with BESS in Tasmania
4 July 2025
-
Hidroelectrica awards EUR 9.5 mln floating photovoltaic system in Romania
3 July 2025
-
Consortium wins Egypt desalination plant EPC contract
3 July 2025
-
Mozambique Grants Zambia Land for Dry Port Project in Nacala
2 July 2025
-
Madagascar signs deal to develop 50 MW of solar with 25 MWh of storage
2 July 2025
-
Globeleq’s Red Sands battery energy storage project reaches financial close
2 July 2025