NESMA awarded Substation Contracts Worth $213 million in NEOM
4 October 2023
Nesma Infrastructure & Technology (NIT), Saudi Arabia has won additional projects with the Saudi Electricity Co. to design, build and commission two transmission substations along with the corresponding overhead transmission lines and connection to the grid.
The projects, worth around SAR 800 million.
The Projects will have a 20-month delivery schedule.
The projects are located in a mountainous region of NEOM called Trojena which is anticipated to be a world-class destination offering the Gulf’s only outdoor skiing venue in addition to year-round adventure sports, activities, shopping, dining and entertainment.
Trojena’s altitude ranges between 1500 and 2600 meters offering a cooler climate year round. Trojena is part of the Kingdom’s push to create distinctive tourist destinations and international scientific hubs.
Related
-
Webuild-led team lands Riyadh Red Line extension
14 January 2026
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026
-
Chinese contractor wins Wasl Jumeirah Golf Estates deal
11 January 2026
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Chinese company wins Morocco phosphates project
9 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2