Elsewedy Electric awarded Supply of Cables Contract for NEOM’s The Line
25 August 2023
Elsewedy Electric KSA announces tha the Company is proud to be part of the NEOM project, providing low-voltage and medium-voltage cables for the two 28km tunnels that make up part of “The Line”.
Set in the Neom Mega City, this 170 km belt will become a massive green space, offering unique hyper-connected communities that are free from cars and roads, which contributes to the reduction of carbon emissions.
Neom is a revolutionary city designed to inspire an alternative way of living and respond to some of the most critical global challenges urban areas face. Neom is committed to providing 100% renewable energy, with solar, wind, and hydrogen-based power generation ensuring that the city will be completely carbon neutral, with zero emissions.
The Line will be the world’s first zero-gravity vertical city. There will be a hyper rail line running through the city to boost travel and these tunnels will be powered through a renewable-powered electric system making transportation far more efficient and reliable.
Related
-
Poland seeks delivery partner for new international airport
27 July 2025
-
South Africa approves six solar projects totaling 1,290 MW
25 July 2025
-
Saudi Arabia Invites PQ for Strategic Reservoirs and Water Transmission Systems on PPP model
25 July 2025
-
Masdar, Iberdrola achieve financial close for $6.1bln East Anglia THREE Offshore wind project
25 July 2025
-
Saudi Arabia announces $6.4bln in Syria investments
25 July 2025
-
MGC, Lantania Consortium awarded $544 million Jubail Desalination Plant Contract
24 July 2025