Adani commissions 2 GW of solar for SECI tender
21 August 2023
Adani Green Energy has commissioned a 2 GW solar cell and module factory under a manufacturing-linked tender by Solar Energy Corp. of India (SECI). The plant is located in Mundra, Gujarat.
Adani Green Energy secured 8 GW of solar projects under the manufacturing-linked PV tender, contingent on establishing 2 GW of PV cell and module manufacturing capacity.
In a stock exchange disclosure, Adani Green Energy said that its associate firm, Mundra Solar Energy, obtained commercial operational date certification from SECI for a solar cell and module manufacturing facility with 2 GW of annual capacity.
Adani Green Energy holds a 26% stake in Mundra Solar Energy via its wholly owned subsidiary, Adani Renewable Energy Holding Four Ltd.
Related
-
PPC, Metlen ink regional deal for 1.5 GW in batteries
11 March 2026
-
Nordex wins order for 40 turbines for German wind farms
11 March 2026
-
Firm signs $120m Egypt new capital industrial complex deal
10 March 2026
-
EU opens third cross-border solar tender
6 March 2026
-
Daewoo pulls out of Libya upstream tender
5 March 2026
-
Argentina tenders 700 MW of battery storage nationwide
4 March 2026


京公网安备
11010802030424号
京ICP备19046776号-2