Adani commissions 2 GW of solar for SECI tender
21 August 2023
Adani Green Energy has commissioned a 2 GW solar cell and module factory under a manufacturing-linked tender by Solar Energy Corp. of India (SECI). The plant is located in Mundra, Gujarat.
Adani Green Energy secured 8 GW of solar projects under the manufacturing-linked PV tender, contingent on establishing 2 GW of PV cell and module manufacturing capacity.
In a stock exchange disclosure, Adani Green Energy said that its associate firm, Mundra Solar Energy, obtained commercial operational date certification from SECI for a solar cell and module manufacturing facility with 2 GW of annual capacity.
Adani Green Energy holds a 26% stake in Mundra Solar Energy via its wholly owned subsidiary, Adani Renewable Energy Holding Four Ltd.
Related
-
Masdar and Engie achieve financial close for 1.5gw Khazna solar project in Abu Dhabi
22 January 2026
-
Dubai tenders Al-Maktoum airport metro link
21 January 2026
-
Montenegro’s power utility EPCG, Masdar sign cooperation agreement
16 January 2026
-
Engie wins SECI bid for 200MW solar PV-600MWh battery project in India
15 January 2026
-
Ecuador plans 2.1 GW power auction with high share of solar
12 January 2026
-
Montenegro gets €175m from EU to modernise rail
11 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2