Adani commissions 2 GW of solar for SECI tender
21 August 2023Adani Green Energy has commissioned a 2 GW solar cell and module factory under a manufacturing-linked tender by Solar Energy Corp. of India (SECI). The plant is located in Mundra, Gujarat.
Adani Green Energy secured 8 GW of solar projects under the manufacturing-linked PV tender, contingent on establishing 2 GW of PV cell and module manufacturing capacity.
In a stock exchange disclosure, Adani Green Energy said that its associate firm, Mundra Solar Energy, obtained commercial operational date certification from SECI for a solar cell and module manufacturing facility with 2 GW of annual capacity.
Adani Green Energy holds a 26% stake in Mundra Solar Energy via its wholly owned subsidiary, Adani Renewable Energy Holding Four Ltd.
Related
-
ACME secures $363m from REC for 280MW renewable energy project
15 August 2025
-
Nextracker to supply solar tracker solutions for 1.5GW projects in Brazil
15 August 2025
-
Local firm submits lowest bid for $1.7bn Kuwait power project
14 August 2025
-
Strabag to turn former Polish coal mine into tech hub
14 August 2025
-
Porr wins two Polish rail contracts worth €532m
14 August 2025
-
Iraq to build 20 new cities near Baghdad
14 August 2025