Adani commissions 2 GW of solar for SECI tender
21 August 2023
Adani Green Energy has commissioned a 2 GW solar cell and module factory under a manufacturing-linked tender by Solar Energy Corp. of India (SECI). The plant is located in Mundra, Gujarat.
Adani Green Energy secured 8 GW of solar projects under the manufacturing-linked PV tender, contingent on establishing 2 GW of PV cell and module manufacturing capacity.
In a stock exchange disclosure, Adani Green Energy said that its associate firm, Mundra Solar Energy, obtained commercial operational date certification from SECI for a solar cell and module manufacturing facility with 2 GW of annual capacity.
Adani Green Energy holds a 26% stake in Mundra Solar Energy via its wholly owned subsidiary, Adani Renewable Energy Holding Four Ltd.
Related
-
US agency to do more equity investing in Africa, official says
10 October 2026
-
GEN İlaç (Türkiye) Inaugurates Pharmaceutical Plant in Azerbaijan
9 October 2026
-
2 GW TOYO Solar Module Factory: Expansion Completed in Humble, Texas
9 October 2026
-
Oracle, Broadcom, and SpaceX looking to secure ten of billions in financing to support AI compute purchases – report
9 October 2026
-
Sumitomo to invest in 500MWp renewable energy project in India
9 October 2026
-
Chevron signs Egypt oil and gas exploration deal
8 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2