Morocco launches tender for 400 MW / 400 MWh solar-plus-storage project
10 August 2023
The Moroccan Agency for Sustainable Energy (Masen) has launched a tender for the Noor Midelt III project – a 400 MW photovoltaic plant that will be connected to 400 MWh of battery storage.
The agency said the project will raise the solar capacity of the Noor Midelt project, which also includes the Noor Midelt I and Noor Midelt II solar plants, to 1.6 GW.
Interested developers will have time until October 20 to pre-qualify for the tender.
In July, Masen published the list of the 24 bidders that are competing to build the Noor Midelt II project. planned for the Drâa-Tafilalet region in northeastern Morocco, will have 400 MW of capacity. It will include a battery, with two hours of storage.
The Noor Midelt I plant, an 800 MW solar plant combining CSP and PV with 5 hours of storage capacity, is to be built and operated by EDF Renewables (35%), Abu Dhabi Future Energy CO (30%), Masen itself (25%) and Green Of Africa (10%).
Related
-
Maaden and Aramco sign deal to create joint venture
21 August 2026
-
Saudi Arabia awards estimated $1bn phosphate rail deal
21 August 2026
-
Dubai tenders stormwater drainage projects
17 August 2026
-
Kuwait selects developer for Shagaya zone one plant
14 August 2026
-
Oman reaches financial close on 120MW wind project
13 August 2026
-
Bahrain opens prices for transaction advisory services on Northern Link Road
11 August 2026


京公网安备
11010802030424号
京ICP备19046776号-2