AES switches on 180 MW PV plant linked to 112 MWh of storage in Chile
28 July 2023
AES Andes, a unit of US-based AES Corp., has switched on the largest solar plant connected to battery energy storage in Latin America.
The 180 MW Andes Solar IIb solar project is connected to a 112 MWh lithium battery with five hours of storage capacity. Battery manufacturer Fluence provided the storage systems for the project.
AES installed a 10 MW unit of the plant with its Maverick 5B pre-assembled panel technology, based on prefabricated modular structures that allow the installation of the panels in a third of the time compared to conventional solar systems and using half of their surface area.
The plant is located 230 km east of Antofagasta, in the Atacama Desert, and is part of a solar hub developed by AES Chile in the region. Including the Andes Solar IIb plant, AES currently operates 429 MW of PV in the Antofagasta region.
This year, AES completed the 379 MW Cristales photovoltaic project in the Salar Imilac sector, close to the company’s Andes Solar hub.
Related
-
Iberdrola to buy majority stake in Finnish power distributor Caruna
24 July 2026
-
Financing signed for largest battery storage system in Romania
24 July 2026
-
Trinasolar and Al-Raebi to explore 1.5GW solar pipeline in Yemen
23 July 2026
-
Chinese contractor appointed for 500MW Oman solar plant
23 July 2026
-
Turkey calls to 2026 renewables auction round
19 July 2026
-
Vestas acquires St Patricks Plains Wind Farm in Tasmania
15 July 2026


京公网安备
11010802030424号
京ICP备19046776号-2