AES switches on 180 MW PV plant linked to 112 MWh of storage in Chile
28 July 2023
AES Andes, a unit of US-based AES Corp., has switched on the largest solar plant connected to battery energy storage in Latin America.
The 180 MW Andes Solar IIb solar project is connected to a 112 MWh lithium battery with five hours of storage capacity. Battery manufacturer Fluence provided the storage systems for the project.
AES installed a 10 MW unit of the plant with its Maverick 5B pre-assembled panel technology, based on prefabricated modular structures that allow the installation of the panels in a third of the time compared to conventional solar systems and using half of their surface area.
The plant is located 230 km east of Antofagasta, in the Atacama Desert, and is part of a solar hub developed by AES Chile in the region. Including the Andes Solar IIb plant, AES currently operates 429 MW of PV in the Antofagasta region.
This year, AES completed the 379 MW Cristales photovoltaic project in the Salar Imilac sector, close to the company’s Andes Solar hub.
Related
-
CAF secures $453m maintenance contracts in UK and Colombia
9 May 2025
-
Scatec starts work on $590m solar and battery project
9 May 2025
-
Spain commits €340 million to Casablanca desalination plant
9 May 2025
-
Rosatom suing Finnish companies for $2.8bn over terminated nuclear plant contract
7 May 2025
-
Egypt Signs $120 Million Deal for KIZAD East Port Said project
7 May 2025
-
Google Unit Awards Data-Center Contract to Malaysia’s Gamuda
7 May 2025