AES switches on 180 MW PV plant linked to 112 MWh of storage in Chile
28 July 2023
AES Andes, a unit of US-based AES Corp., has switched on the largest solar plant connected to battery energy storage in Latin America.
The 180 MW Andes Solar IIb solar project is connected to a 112 MWh lithium battery with five hours of storage capacity. Battery manufacturer Fluence provided the storage systems for the project.
AES installed a 10 MW unit of the plant with its Maverick 5B pre-assembled panel technology, based on prefabricated modular structures that allow the installation of the panels in a third of the time compared to conventional solar systems and using half of their surface area.
The plant is located 230 km east of Antofagasta, in the Atacama Desert, and is part of a solar hub developed by AES Chile in the region. Including the Andes Solar IIb plant, AES currently operates 429 MW of PV in the Antofagasta region.
This year, AES completed the 379 MW Cristales photovoltaic project in the Salar Imilac sector, close to the company’s Andes Solar hub.
Related
-
China’s Panhua Group nears completion of Sarangani steel project‘s first phase
26 May 2026
-
Danantara Investment Management Announces the Results of the DPT BUPP PSEL Selection for Batch2
26 May 2026
-
Egypt prepares to tender five water treatment plants
26 May 2026
-
World Bank provides $2bn for Turkey railway corridor
25 May 2026
-
King Salman airport selects three contractors for apron ECI
24 May 2026
-
Japanese firm now fifth biggest US housebuilder after $4bn acquisition
22 May 2026


京公网安备
11010802030424号
京ICP备19046776号-2