Design unveiled for Panama Canal’s fourth bridge
29 June 2023
Two European engineering and architecture companies Sener and Greisch have won a contract to design and build the fourth bridge over the Panama Canal.
The 965m-long cable-stayed bridge will have a 485m main span and a 75m-tall vertical clearance for passing ships.
Work on the project includes interchanges at either side of the canal.
Two double-decker access viaducts with a total length of 2,450m will connect to the interchanges.
Sener and Greisch will work with China Communications Construction Company (CCCC) subsidiary Highway Planning and Design Institute, who will design the structure of the main bridge, on behalf of the Panama Cuarto Puente Consortium (CPCP).
Sener and Greisch are responsible for special studies and supplementary projects. Sener will design the interchanges and access viaducts.
In 2018, CCCC won a legal challenge after its winning bid to build the bridge was appealed by competitors.
Ricardo Sardinha, Sener’s global highways business director, said: “It’s an honour to be part of this ambitious CPCP project, which will improve the lives of Panamanians with a unique structure that poses an engineering challenge.”
Related
-
South Africa adds 890 MW of solar to seventh renewables bid window
19 December 2025
-
Vestas to supply turbines for Dom Inocêncio wind complex in Brazil
19 December 2025
-
Saudi Arabia connects 7.8 GWh battery storage project to grid
19 December 2025
-
CTG Asia-Africa Signs MOU for Solar PV Project in Malaysia
18 December 2025
-
LTA awards over S$300 million in contracts for 660 electric buses, including to BYD
17 December 2025
-
ACCIONA awards the Western Renewable Link project in Australia
17 December 2025


京公网安备
11010802030424号
京ICP备19046776号-2