France allocates 49.8 MW in PV tender for non-interconnected areas
11 May 2023
France‘s Ministry of the Ecological Transition has reported results from the sixth round of the 282 MW solar tender for non-interconnected zones (ZNI). Launched in 2019, it is open to PV projects, including those with storage, ranging in size from 100 kW to 5 MW.
The selection process resulted in the allocation of 89 projects totaling 49.8 MW in Corsica and France's overseas territories. About 20.4 MW were designated for installations ranging from 100 kW to 500 kW on buildings or car park shades, while an additional 12.0 MW were awarded to projects of similar nature with capacities between 500 kW and 1.5 MW.
French developer Albioma secured the largest share of assigned capacity with 8.2 MW. Following closely were GreenYellow with 4.2 MW, Corsica Energia with 4.0 MW, and Corsica Sole with 3.1 MW, ranking second, third, and fourth, respectively.
The CRE originally planned to allocate 83 MW in the procurement exercise.
Related
-
Samsung C&T, Hitachi Energy partner on European power grid market entry
19 April 2026
-
Hochtief team lands €1.2bn Prague metro extension
17 April 2026
-
Danantara forms Denera to expand waste-to-energy push
10 April 2026
-
Croatia tenders 56 MW solar-storage project
9 April 2026
-
Masdar and TotalEnergies form $2.2bn joint venture
6 April 2026
-
Alstom welcomes Martin Sion as Chief Executive Officer, succeeding Henri Poupart-Lafarge
3 April 2026


京公网安备
11010802030424号
京ICP备19046776号-2