RFQ launched for 700 MW Hydroelectric PPP project in Nigeria
17 November 2022
The Bureau of Public Enterprises has issued a Request for Qualifications for the 700 MW Zungeru Hydroelectric Power PPP project in Zungeru Town of Niger State, Nigeria.
The Hydroelectric project is located on the Kaduna River 8 km upstream of the confluence of the Gumma River. It consists of four 175MW turbine/generating units built over an area of 39,950 sq km. The project includes a reservoir at an elevation of 230 m and a concrete faced rock fill dam with a maximum height of approximately 113 m.
The last date to submit the response is November 24, 2022.
Related
-
US agency to do more equity investing in Africa, official says
10 October 2026
-
GEN İlaç (Türkiye) Inaugurates Pharmaceutical Plant in Azerbaijan
9 October 2026
-
2 GW TOYO Solar Module Factory: Expansion Completed in Humble, Texas
9 October 2026
-
Oracle, Broadcom, and SpaceX looking to secure ten of billions in financing to support AI compute purchases – report
9 October 2026
-
Sumitomo to invest in 500MWp renewable energy project in India
9 October 2026
-
Chevron signs Egypt oil and gas exploration deal
8 October 2026


京公网安备
11010802030424号
京ICP备19046776号-2