Bechtel needs UK suppliers for Albanian dam
5 October 2022
Fierza dam, also on the river Drin, but 100km north of the planned Skavica dam
With British taxpayers (via UKEF) underwriting the involvement of US contractor Bechtel in the £600m Albania project, Bechtel is required to put some work to British suppliers (or at least suppliers with a registered office in the UK, regardless of actual domicile).
The 210MW Skavica project involves the construction of a regulating dam on the river Drin in Albania. The project is being developed by the Albanian Power Corporation (KESH), the public producer and supplier of 75% of Albania’s electricity.
Bechtel is looking to meet UK companies that are interested in supporting the execution of the project and have the capabilities within the civil, structural or mechanical engineering and/or construction equipment.
A supplier fair is being held on 20th and 21st October 2022 at 1 Great George Street (home of the Institution of Civil Engineers), London SW1P 3AA.
Related
-
Cimic wins Indonesia energy infrastructure job
10 January 2026
-
Saudi Arabia qualifies developers for renewable projects
9 January 2026
-
Consultant appointed for Qatar-Bahrain causeway study
7 January 2026
-
Vestas gets 390MW wind turbine order in South Korea
5 January 2026
-
Bangladesh seeking contractors for 220 MW solar project
5 January 2026
-
Webuild won €660 million Naples Metro Line 10 in Italy
2 January 2026


京公网安备
11010802030424号
京ICP备19046776号-2