Preferred bidder selected for 1.32 GW Offshore wind Transmission Link project
9 September 2022Diamond Transmission Partners, a consortium comprised of Mitsubishi Corporation and HICL Infrastructure plc, has been selected by Ofgem as the preferred bidder to own and operate the GBP1.2 billion (US$1.4 billion) high voltage transmission connection link project that will serve the Hornsea 2 offshore wind farm located 89 km off the Yorkshire coast of the UK.
Ørsted’s 1,320 MW Hornsea 2 wind farm will have up to 165 SG 8.0-165 DD wind turbines of 8 MW. The project will be connected to the grid via a high-voltage transmission connection link. The 245 kV high-voltage cables with a total length of over 200 km, including three far-shore cables, cover about 50% of the entire project and connect the wind park to the reactive power compensation platform that brings electricity to the mainland.
Related
-
Wabtec secures $405m Kazakhstan locomotive deal
2 November 2024
-
ICG enters South Korean renewables market with stake in Revent Energy
2 November 2024
-
VINCI acquires FM Conway Limited in the United Kingdom
1 November 2024
-
SCG to invest $700 mln more in petrochemicals complex in Vietnam
1 November 2024
-
Saudi Binladin to receive $6bn loan
1 November 2024
-
Webuild picked for radical makeover of Bologna FC’s Dall’Ara stadium
1 November 2024