Oman seeks Consultancy Services for Wind IPPs
25 July 2022
The Oman Power and Water Procurement Company SAOC (OPWP), a member of Nama Group seeks to undertake a technical and economic feasibility study for developing wind IPPs.
This project shall consist of two stages: the first stage shall involve producing the feasibility study, whereas the second stage shall consist of providing technical consultancy services for the wind IPPs constructed as a result of the aforementioned study, and that is after obtaining the necessary approvals.
Accordingly, OPWP would like to appoint a qualified and experienced technical and economic consultant for the development of wind IPPs.
The tender documents are available for purchase in an electronic format through OPWP website, statement mentioned.
A bid bond (in the form set out in the tender) of at least 1% of the fixed price value of the Contract, to be valid for a period of 120 days from the submission deadline date, 05 September 2022 is required along with the Proposals.
Related
-
Qatar tenders Smaisma infrastructure contract
18 September 2025
-
Strabag wins €298m contract to modernise Polish rail
18 September 2025
-
Saudi contractor awarded $121m housing construction contracts
17 September 2025
-
QatarEnergy signs 2GW Dukhan solar plant deal with Samsung
17 September 2025
-
EDP completes deal for 121 MW wind portfolio in France and Belgium
16 September 2025
-
IB Solar plans 4 GW TOPCon cell and module factory in India
16 September 2025