CEEC signed contract of 330 KV electric transmission line in Nigeria
22 July 2022CEEC and Transmission Company of Nigeria have signed the contract of the 330 KV electric transmission line from Abia State to Anambra State recently.

The contract covers design, manufacture, supply, installation and pilot run of the power project. Upon completion, the 138-kilometer-long facility is expected to mitigate the power supply pressure in South Nigeria and greatly enhance the stability and flexibility of regional power supply.
Related
-
Nigeria, Longi sign deal to build solar panel factory
28 October 2025
-
NHC signs Al-Fursan project deal with South Korean firm
28 October 2025
-
Bechtel wins EPCM contract for Saudi Arabia's Maaden gold project
27 October 2025
-
Samsung and KAFD Signs MOU for Smart City Innovation In Riyadh
24 October 2025
-
Kuwait signs $500mln wastewater treatment plant deal with Turkey’s Kuzu
23 October 2025
-
Egypt's SCZONE attracts new Chinese textile investments in Sokhna Industrial Zone
22 October 2025


京公网安备
11010802030424号
京ICP备19046776号-2