Philippines to hold 2-GW renewables auction in June 2022
15 May 2022
The Philippine Department of Energy (DOE) plans to hold the first round of bidding for 2,000 MW of renewable capacity under the Green Energy Auction Program (GEAP) on 17 June 2022. The country aims to award 1,260 MW of solar capacity (900 MW in Luzon, 260 MW in the Visayas and 100 MW in Mindanao), 380 MW of wind (360 MW in Luzon and 20 MW in the Visayas), and 230 MW of biomass (120 MW in the Visayas, 60 MW in Luzon and 50 MW in Mindanao) and 130 MW of hydropower (80 MW in Luzon and 50 MW in Mindanao).
The proposed tariff for solar technology has been set at PHP3.6248/kWh (US$6.9c/kWh); wind at PHP5.2887/kWh (US$10c/kWh); biomass at PHP5.5480/kWh (US$10.6c/kWh); and run-of-river hydro at PHP5.8705/kWh (US$11.2c/kWh).
The Philippines has an installed capacity of 26.8 GW (end-2021), with 41% of coal, 17% of oil, 14% of hydro and 13% of gas. The share of renewables has been rising in recent years, with solar now accounting for 5% of the installed capacity and wind for 2%.
Related
-
World Bank provides $2bn for Turkey railway corridor
25 May 2026
-
King Salman airport selects three contractors for apron ECI
24 May 2026
-
Japanese firm now fifth biggest US housebuilder after $4bn acquisition
22 May 2026
-
Edify reaches financial close on Rio Tinto-contracted solar-BESS parks
22 May 2026
-
Engie launches global business services center in Romania
20 May 2026
-
JinkoSolar, Masdar sign 2GW PV module supply agreement for RTC project
18 May 2026


京公网安备
11010802030424号
京ICP备19046776号-2