Oman invites PQ for Industrial Waste Treatment Facility in Sohar
7 March 2022Oman Environmental Services Holding Co S.A.O.C.(be’ah) invite interested Companies or JointVentures (JV) to participate in the Pre-qualification for the Engineering, Procurement, and Construction(EPC) of the Industrial Waste Treatment Facility in Sohar FreeZone Phase 2.
Phase 2 of the Industrial Waste Treatment Facility development in large is concentrated around a rotary kiln incineration plant, physical/chemical treatment facility and supporting infrastructure and balance of plant systems.
The Companies or Joint Ventures (JV) should demonstrate their experience and document that it satisfies be’ah’s requirements regarding the company status, experience, capability, and capacity to undertake, complete, and deliver the required scope of work.
This must be done through elaborating and documenting their previous experience in projects of a similar type, size, scope, quality and complexity. Companies must also document the capability of completing similar project works in a timely manner, statement mentioned.
PQ Documents should submit by 12 May 2022.
Related
-
Bahrain: List of Bidders applied for PQ of 1,200 MW Sitra IWPP
27 December 2024
-
Soyak to install 80 MW geothermal power plant in Croatia
26 December 2024
-
AMEA Power awarded two battery energy storage projects in South Africa
26 December 2024
-
Iberdrola completes merger with Avangrid
26 December 2024
-
AD Ports Group awards construction contract for Egypt’s Safaga Terminal
26 December 2024
-
Saudi’s Red Sea International Co. Subsidiary Signs $85 million MEP Works Contract
26 December 2024