Work of 43km motorway in Romania to begin
26 January 2022
Work on Romania’s Fagaras-Brasov stretch of the 130km-long Brasov-Sibiu motorway is expected to start early this year.
Last summer the government’s road construction and management company CNAIR signed a design contract for the 43km Fagaras-Brasov section of the much-delayed motorway. Catalin Drula, transport minister, noted at the time the Fagaras-Brasov section of the A3 Transylvania Highway was put up for auction this spring, after being abandoned for 10 years.
The entire Brasov-Sibiu motorway is estimated to have cost around €1.47 (US$1.7 billion). Construction of the Sibiu-Fagaras stretch of the Brasov-Sibiu motorway is reportedly to be in advanced stages.
Related
-
Enery Signs 10-Year Green Power Deal With Orange Slovensko
25 August 2026
-
Maaden and Aramco sign deal to create joint venture
21 August 2026
-
Saudi Arabia awards estimated $1bn phosphate rail deal
21 August 2026
-
Dubai tenders stormwater drainage projects
17 August 2026
-
Kuwait selects developer for Shagaya zone one plant
14 August 2026
-
Oman reaches financial close on 120MW wind project
13 August 2026


京公网安备
11010802030424号
京ICP备19046776号-2