Egypt Cairo BRT Construction of First 10 Stations Begins
12 January 2022
The Egyptian Transport Minister Kamel al-Wazir recently announced that the actual construction of the first 10 Bus Rapid Transit (BRT) system stations, as part of the ongoing development of a BRT system on Cairo’s Ring Road, has begun following the completion of the architectural and construction diagrams.
Other than the construction of the stations the BRT system project on Cairo’s Ring Road also includes the construction of car parks and development of BRT special lines that will be connected with the third metro line at Adly Mansour Station in Cairo and Road Al Farag Axis Station in Giza.
The lines will also be linked with the planned fourth and sixth lines and the extension of the second line in Qalyoub.
Related
-
Construction begins on Dubai Creek Gardens project
17 September 2026
-
Sacyr selected for Second Concession of Route 57 Santiago - Colina - Los Andes in Chile
14 September 2026
-
Humain breaks ground on Neom’s Oxagon data center
11 September 2026
-
Sungrow launches 10GWh Egypt energy storage facility
7 September 2026
-
Egypt signs PPA for 1GW Ras Shokeir wind farm
2 September 2026
-
AECOM, AtkinsRealis awarded Hong Kong’s Northern Metropolis Highway (San Tin Section) project
2 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2