Egypt Cairo BRT Construction of First 10 Stations Begins
12 January 2022
The Egyptian Transport Minister Kamel al-Wazir recently announced that the actual construction of the first 10 Bus Rapid Transit (BRT) system stations, as part of the ongoing development of a BRT system on Cairo’s Ring Road, has begun following the completion of the architectural and construction diagrams.
Other than the construction of the stations the BRT system project on Cairo’s Ring Road also includes the construction of car parks and development of BRT special lines that will be connected with the third metro line at Adly Mansour Station in Cairo and Road Al Farag Axis Station in Giza.
The lines will also be linked with the planned fourth and sixth lines and the extension of the second line in Qalyoub.
Related
-
Acciona to build São Paulo road for €334m
14 February 2026
-
Webuild hits the road in Virginia
8 February 2026
-
Riyadh qualifies six groups for One-Stop Stations PPP
3 February 2026
-
ACCIONA awarded road link project in southern São Paulo
21 January 2026
-
Consultant appointed for Qatar-Bahrain causeway study
7 January 2026
-
Egypt, China’s XD Group discuss localising electrical equipment manufacturing
24 December 2025


京公网安备
11010802030424号
京ICP备19046776号-2