Egypt Cairo BRT Construction of First 10 Stations Begins
12 January 2022
The Egyptian Transport Minister Kamel al-Wazir recently announced that the actual construction of the first 10 Bus Rapid Transit (BRT) system stations, as part of the ongoing development of a BRT system on Cairo’s Ring Road, has begun following the completion of the architectural and construction diagrams.
Other than the construction of the stations the BRT system project on Cairo’s Ring Road also includes the construction of car parks and development of BRT special lines that will be connected with the third metro line at Adly Mansour Station in Cairo and Road Al Farag Axis Station in Giza.
The lines will also be linked with the planned fourth and sixth lines and the extension of the second line in Qalyoub.
Related
-
越南维和公司启动投资2900万美元咖啡加工厂项目,优化出口供应链
16 October 2026
-
Scatec starts construction of the 900 MW Shadwan wind farm
13 October 2026
-
L&T Transportation Infrastructure Vertical Secures Twin Contracts in Dubai
10 October 2026
-
Chevron signs Egypt oil and gas exploration deal
8 October 2026
-
MGEN’s PacificLight breaks ground on 670 MW gas-BESS plant in Singapore
29 September 2026
-
RWE and Giga Storage move to construction on gigawatt-hour Netherlands and Belgium batteries
25 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2