Egypt Cairo BRT Construction of First 10 Stations Begins
12 January 2022
The Egyptian Transport Minister Kamel al-Wazir recently announced that the actual construction of the first 10 Bus Rapid Transit (BRT) system stations, as part of the ongoing development of a BRT system on Cairo’s Ring Road, has begun following the completion of the architectural and construction diagrams.
Other than the construction of the stations the BRT system project on Cairo’s Ring Road also includes the construction of car parks and development of BRT special lines that will be connected with the third metro line at Adly Mansour Station in Cairo and Road Al Farag Axis Station in Giza.
The lines will also be linked with the planned fourth and sixth lines and the extension of the second line in Qalyoub.
Related
-
Amea Power signs 1.5GWh battery storage EPC contracts
9 June 2026
-
Chinese firm breaks ground on $1.1bn Oman battery plant
6 June 2026
-
Egypt prepares to tender five water treatment plants
26 May 2026
-
Abu Dhabi seeks firms for Mid Island Parkway PPP
17 May 2026
-
China to build €1.3bn Serbian expressway
14 May 2026
-
Strabag team lands €177m motorway contract
14 May 2026


京公网安备
11010802030424号
京ICP备19046776号-2