Supreme Energy Rantau Dedap begins operations at geothermal plant
12 January 2022
Indonesia-based energy company PT Supreme Energy Rantau Dedap (SERD) has announced that the first phase of the Rantau Dedap geothermal power plant in Indonesia has started commercial operations.
The project’s first phase has 91.2MW of capacity and has been developed with an investment of more than $700m.
The geothermal facility is located in Muara Enim Regency, Lahat Regency and Pagar Alam City, South Sumatra Province.
Energy generated by the plant will be delivered to PT PLN (Persero) Sumatra’s grid transmission to ensure a reliable electricity supply in the Sumatra region.
SERD is a joint venture between PT Supreme Energy, ENGIE, Marubeni Corporation and Tohoku Electric Power.
Related
-
Bulgaria signs offshore oil, gas exploration deal with Shell
16 April 2025
-
India finances two Sri Lankan rail projects
16 April 2025
-
Zambia to resume construction of power line to Tanzania
16 April 2025
-
Procurement starts for future UAE-Qatar road link
16 April 2025
-
German firm to spend €1.6bn converting power plants to hydrogen
15 April 2025
-
Four in race to supply reactors to Kazakhstan’s first nuclear power plant
15 April 2025