Gadang Signs To Build 5.9 MW Solar Plant In Malaysia
1 January 2022
Gadang Holdings Berhad signs a power purchase agreement (PPA) for building a 5.9 MW solar plant in Malaysia. Gadang signed the PPA for the duration of 21 years.
Gadang is an investment holding company while its subsidiaries are principally involved in civil engineering and construction, property development, water supply, and mechanical & electrical engineering services.
Nusantara Suriamas Sdn Bhd (NSSB), a 70% owned subsidiary of Gadang will build, design, own, operate, commission, test, and maintain the solar power plant unit in Tawau, Sabah.
Related
-
Saudi Arabia issues tenders for two PPP water projects
12 September 2025
-
Consortium wins $500m Saudi wastewater treatment project
11 September 2025
-
Romania’s Electrica and Romgaz to partner on 400 MW green power projects
10 September 2025
-
Turkey launches solar, wind power auctions with November deadlines
10 September 2025
-
Mitsubishi Power to supply gas turbines to O Mon 4 Power Plant in Vietnam
10 September 2025
-
Egypt, Emaar Misr, and Citystars ink $18 billion deal for Marassi Red Sea Project
10 September 2025