AIIB Increases Green Public Rail Transport Options in India
2 October 2021
The Asian Infrastructure Investment Bank (AIIB) has approved a USD356.67-million loan to the Government of India to support the expansion of the Chennai metro rail system.
The project involves the construction of a new corridor in Chennai’s metro network as part of Chennai Metro Rail Phase 2. It will span from Lighthouse in the east to Poonamalee Bypass in the west to ensure seamless multimodal transport across Chennai by providing integrated access to suburban rail, bus stations and the city’s main airport. In addition, the project will address traffic bottlenecks and reduce greenhouse gas emissions by increasing public urban transport options.
“This project is aligned with AIIB’s mandate to support high-quality and sustainable infrastructure. The improvement and integration of the transport sector in Chennai will further promote trade and economic growth,” said AIIB Vice President, Investment Operations, D. J. Pandian.
The project will be implemented by the Chennai Metro Rail Limited.
With this project, female passengers would have access to a safer and convenient mode of public transportation with knock-on effects such as increased opportunities to participate in school, work and social activities. The residential and commercial establishments along the new corridor will also benefit from enhanced accessibility and connectivity as well as increased economic opportunities.
The project’s design and construction will have environmentally friendly features to help reduce its carbon footprint. In addition to solar panels installed on the roofs of the elevated stations, the project will have dedicated spaces for bicycles and green vehicles, and signage to raise environmental awareness. The project also integrates climate change resilience features to reduce its vulnerability to climate-related events.
AIIB has approved 28 projects in India, with a total amount of USD6.7 billion. The energy and transport sectors have received the highest amount of AIIB’s financing.
Related
-
Uzbekistan escrow transactions rise 3.8% to 34,659 in September
17 October 2026
-
Figures attributed to IRENA on African mini-grids remain unconfirmed
16 October 2026
-
Sumitomo Acquires 49% of Hero Group's 500 MWp Solar-Wind Project with Storage
13 October 2026
-
South Africa to procure 4.6 GW of battery storage
9 October 2026
-
Sumitomo to invest in 500MWp renewable energy project in India
9 October 2026
-
Metals Exploration completes $27m La India loan withdrawal
29 September 2026


京公网安备
11010802030424号
京ICP备19046776号-2